Hauling water with tankers is all about efficiency and effectiveness. Anything that can be done to reduce set-up time will pay big dividends in the long run. At one of our water supply seminars, we came across Tanker 3 from the Pound Ridge FD in Westchester County, New York that is set up very nicely to not only haul water but to support dump site and fill operations if needed. Tanker 3 carries two jet siphons pre-connected to two lengths of 6-inch suction hose on the side of the rig. What does this do? It reduces the effort needed to locate the jet siphons on the rig and then connect them to the hose and so on...
Reduced set-up time = improved efficiency! Excellent work! We like it!
Pound Ridge FD Tanker 3 not only can deliver 3,550 gallons of water - it can provide much needed appliances and devices for dump site and fill site operations.
With jet siphons already connected, this suction hose is ready for deployment at a dump site operation. Tanker 3 can leave a dump tank and two jet siphons w/suction hose at ANY dump site - that is pretty efficient! Oh - it can leave 3,550 gallons of water also!