Hauling water with tankers is all about efficiency and effectiveness. Anything that can be done to reduce set-up time will pay big dividends in the long run. At one of our water supply seminars, we came across Tanker 3 from the Pound Ridge FD in Westchester County, New York that is set up very nicely to not only haul water but to support dump site and fill operations if needed. Tanker 3 carries two jet siphons pre-connected to two lengths of 6-inch suction hose on the side of the rig. What does this do? It reduces the effort needed to locate the jet siphons on the rig and then connect them to the hose and so on... Reduced set-up time = improved efficiency! Excellent work! We like it! |
|