Got Big Water

YouTube
YouTube Channel

Facebook
Facebook Page

Twitter
Twitter Page

Rural Water Supply Operations Seminar
Rural Water Supply Operations Seminar

Water Supply Officer Seminar
Water Supply Officer Seminar

Relay Pumping With Large Diameter Hose
Relay Pumping With Large Diameter Hose

Dry Fire Hydrants Seminar
Dry Fire Hydrants Seminar

Dry Fire Hydrant Designs and Installations
Dry Fire Hydrant Designs and Installations

Web Counters
Website Visitors
Since
June 22, 2009
3,942,865
Visitors Today
Nov 10, 2026
336



Official PayPal Seal

Tanker Operations #13 - LDH Appliance Use at Fill Sites

Print this story (opens in a new tab)News RSS feed (opens in a new tab)Share on Facebook (opens in a new window)Share on X (opens in a new window)Add a comment

By President Mark Davis
March 16, 2017

After reviewing the more than 50 tanker shuttle drills that we have posted on this site it is pretty clear that those folks who can load tankers using LDH are the same folks that perform quite well at delivering the higher flow rates at the dump site. Effective use of LDH requires the use of LDH appliances. At our 2013 water supply drill in Jarrettsville, Maryland - all of the fill sites used LDH to load tankers. In the photos shown here, we see the Jarrettsville water supply unit take draft from a remote pond and supply water out to a parking lot area where tankers are then loaded using 5-inch LDH. An LDH manifold and jumbo wye were used in combination to support the loading process while also providing a large drain to expedite disconnect operations at the direct fills.

Website Designed and Hosted By: Content Proudly Maintained By: Contact Info:
Firehouse Solutions
www.FirehouseSolutions.com
GBW Associates, LLC
3178 Cardinal Drive
Westminster, MD 21157

Emergency Dial 911
Phone: 443-398-6619
E-mail: thebigcamel@gotbigwater.com
Copyright © 2026 Firehouse Solutions (A Service of Technology Reflections, Inc.)