A couple of years ago we were contracted to repair a dry fire hydrant at a quarry in New Windsor, Maryland. The dry fire hydrant had been damaged during the winter months - most likely from a snow plow. The head was completely missing and needed replacing. Upon further examination, it looked like the pipe was painted first and then the suction head glued onto the pipe during the initial installation. The problem created by that process was that the paint shielded the pipe from the glue and thus the head was not properly bonded onto the pipe.
The repair required sanding off the old paint while being careful not to significantly reduce the diameter of the pipe since a tight, slip-fit connection was needed. Once the new head was installed, all exposed PVC pipe was painted with Krylon Fusion spray paint to protect from UV damage.
The final step was a flow test - which produced a flow in excess of 1,000 gpm.
A missing suction head called for the repair of this dry fire hydrant.
One of the problems was that the pipe had been painted first and then the original suction head had been glued onto the pipe.
The previous gluing process contributed to the loss of the suction head.
The dry fire hydrant gets its supply from this large reservoir at a local stone quarry.
The paint had to be removed in order for the PVC glue to contact the pipe and the suction head fitting.
The new head is prepared. The pipe had to be extended some in order to allow better access for drafting.
All installed.
Time for paint.
All painted and ready for testing.
Setting up to flow test the dry fire hydrant.
1,000 gpm+ flowtest!
Blue reflective marking tape added to the protective bollards.