Got Big Water

YouTube
YouTube Channel

Facebook
Facebook Page

Twitter
Twitter Page

Rural Water Supply Operations Seminar
Rural Water Supply Operations Seminar

Water Supply Officer Seminar
Water Supply Officer Seminar

Relay Pumping With Large Diameter Hose
Relay Pumping With Large Diameter Hose

Dry Fire Hydrants Seminar
Dry Fire Hydrants Seminar

Dry Fire Hydrant Designs and Installations
Dry Fire Hydrant Designs and Installations

Web Counters
Website Visitors
Since
June 22, 2009
3,936,757
Visitors Today
Nov 07, 2026
568



Official PayPal Seal

Tanker Operations #03 - When to Go?

Print this story (opens in a new tab)News RSS feed (opens in a new tab)Share on Facebook (opens in a new window)Share on X (opens in a new window)Add a comment

By President Mark Davis
October 9, 2014

When using traditional gravity tankers (tenders) in a shuttle operation, the sometimes "tricky" question is, "When do we to stop dumping water and go for another load." Ideally - each tanker should have a pre-determined "critical dump time" at which point the operator stops dumping. When using a 10-inch Newton-style dump, another reasonable rule of thumb is to stop dumping when the water drops below the 2-inch point on the chute - close the valve - and go get another load of water. Of course - this really depends on whether or not another tanker is in line waiting to get into position to dump.

The worst decision is to wait until the water is just trickling out of the dump chute. Remember that a tanker shuttle is best served when units are moving in the shuttle and not waiting to offload every last drop of water.

Website Designed and Hosted By: Content Proudly Maintained By: Contact Info:
Firehouse Solutions
www.FirehouseSolutions.com
GBW Associates, LLC
3178 Cardinal Drive
Westminster, MD 21157

Emergency Dial 911
Phone: 443-398-6619
E-mail: thebigcamel@gotbigwater.com
Copyright © 2026 Firehouse Solutions (A Service of Technology Reflections, Inc.)