During our travels across the USA, we often encounter tankers that use some type of manually detachable dump chutes. Many times, those chutes have to be taken off while the vehicle is travelling - and often times those chutes are stored in a compartment or require some type of fastener engagement - all increasing the time spent at the dump site before the tanker can leave for its next load of water.
A better practice is to simply leave the dump chute at the dump site. Since the chute is only needed when the tanker dumps, if it is left at the dump site, then all that needs to happen is for it to be attached so that water can be dumped. There is no time spent trying to get the chute back into its proper storage location after water is dumped.
Sometimes - the same one chute can be used on multiple tankers. Of course, one also has to be careful of having 9 diffferent chutes laying around th dump site - but our experience has been this doesn't occur very often.
Upon arrival at the dump site, the folks working the site would simply attach the chute to Roanoke's tender and let the water go. The driver never left the tender.
At this 2010 water supply drill in Deer Creek, Illinois, Roanoke Tender 2 left its dump chute at the dump site each time instead of taking the time to secure it back on the tender. This saved valuable time in terms of keeping the tender moving and hauling water.
At this 2010 water supply drill in DeKalb County, Alabama, this dump chute fit a number of tankers - including the one shown in this photo.