Got Big Water

YouTube
YouTube Channel

Facebook
Facebook Page

Twitter
Twitter Page

Rural Water Supply Operations Seminar
Rural Water Supply Operations Seminar

Water Supply Officer Seminar
Water Supply Officer Seminar

Relay Pumping With Large Diameter Hose
Relay Pumping With Large Diameter Hose

Dry Fire Hydrants Seminar
Dry Fire Hydrants Seminar

Dry Fire Hydrant Designs and Installations
Dry Fire Hydrant Designs and Installations

Web Counters
Website Visitors
Since
June 22, 2009
3,959,445
Visitors Today
Nov 17, 2026
1,631



Official PayPal Seal

Dump Site Operations #27 - The Dump Tank Liner

Print this story (opens in a new tab)News RSS feed (opens in a new tab)Share on Facebook (opens in a new window)Share on X (opens in a new window)Add a comment

By President Mark Davis
January 25, 2024

Another simple but important item....this time regarding dump tank deployment. When deploying a rigid-frame portable dump tank it is important to make sure that the liner is pushed back into each corner so that the liner is evenly (as best as possible) centered in the tank before the first load of water is dumped. If the liner is not evenly lined up in the four corners (and sides) then that first load of water can easily cause a pretty severe load on the rigid frame which probably is then going to result in frame distortion and possibly bend the frame. In the photo shown in this News Story, water was dumped into this dump tank before the liner was tucked back into the corners and the weight of that first load of water distorted the tank frame.

Website Designed and Hosted By: Content Proudly Maintained By: Contact Info:
Firehouse Solutions
www.FirehouseSolutions.com
GBW Associates, LLC
3178 Cardinal Drive
Westminster, MD 21157

Emergency Dial 911
Phone: 443-398-6619
E-mail: thebigcamel@gotbigwater.com
Copyright © 2026 Firehouse Solutions (A Service of Technology Reflections, Inc.)