After obtaining a draft from the basin, some "crud" was found flowing out of the Hose Monster that was being used to measure flow.
|
|
When flowing the pre-piped deck gun we found that some "aquatic growth materials" had made it to the nozzle screen.
|
|
|
The operation was shut down because it was clear that "stuff" was making it through the suction strainer. At the external butterfly valve more of the "stuff" was found.
|
|
A closer look shows what appears to be a clump of aquatic grass like material.
|
|
|
Quite a clump of "stuff" was removed from the suction inlet valve.
|
|
This drafting site clearly needs some maintenance - there is a build up of vegetation near the basin inlet and that will need to be cleared out.
|
|
|
This suction point is set up as a drafting basin which is fed via a concrete culvert pipe that runs out to the pond shown in the background. When needed, the FD slides the concrete cover off of the manhole-style structure and drops their hard suction hose into the basin.
|
|
|