West Virginia Water Shuttle Drill - October 6, 2013

 
By Member Jason Estep
October 28, 2013
 

The Morrisvale VFD hosted a water shuttle drill on Oct. 5th & 6th. 6 Vacuum tankers participated in the drill, meaning NO FILL SITE PUMPERS WERE NEEDED! The shuttle averaged 884 GPM, peaking at one point at 1215 gpm. I expected our average to be in the 1000-1250 gpm range, but we were hampered by leaves in the stream that would get in the strainers and slow the fill times. It also created problems for the fill site pumper, as we were hauling water and leaves to the dump tank which stopped the strainer up on the pumper. Danville VFD brought their 2000 gpm pumper for the drill, but we kept having trouble with what we thought was the pressure governor. We eventually brought in another pumper, which experienced the same issue, at which point we figure out the strainers were clogging with small pieces of leaves. We rectified this by using the FIROVAC Floating strainer without the pan, which gave us enough surface area that it did not clog (we also flowed over 1350 gpm through this pumper for a short period of time). Danville then began pumping the transfer tubes to keep water to the other engine which was setup at the very last dump tank, which was a challenge in its self. The crews did an excellent job overcoming this adversity and getting another truck setup. Special thanks to Rt. 34 VFD, Danville VFD, Guyan River VFD, Mud River VFD, Wharton-Barrett VFD for providing apparatus and the Morrisvale VFD for once again hosting the class. Thanks to GBW member Charlie Clark for the photos.