Reviewing tanker loading operations.
|
|
Reviewing dump tank arrangement choices.
|
|
|
Dover Engine 7 - 1500 gpm/1000 gal.
|
|
Practicing drafting from a dry fire hydrant.
|
|
|
Reviewing jet siphon set-up choices.
|
|
Practicing a two-tank dump site operation.
|
|
|
Suction elbow use helps ensure a better intake flow for the pump.
|
|
A TFT control valve in use at the tanker loading site.
|
|
|
Examining loading pressures at the tanker direct fill inlet.
|
|
Reviewing TurboDraft operations.
|
|
|
Deploying TurboDraft.
|
|
Deploying Turbo Draft.
|
|
|
Turbo Draft's output.
|
|
Dover Engine 7 practices fill site operations supplied using an open relay and Turbo Draft.
|
|
|
Turbo Draft in use.
|
|
Hampton Falls Tanker 4 - 1000 gpm/2500 gal.
|
|
|
Stratham Tanker 8 - 2000 gpm/3000 gal
|
|
Stratham Engine 1 - 1500 gpm/1000 gal.
|
|
|
Tanker 8 supports the rural hitch.
|
|
Loading operations at the fill site.
|
|
|
Dover Engine 7 operates as the dump site engine as Stratham Tanker 8 arrives just in time to dump its 3,000 gallons of water.
|
|
A bit of a clog.
|
|
|
The water supply drill used a 2-tank arrangement.
|
|
Dumping and transferring water.
|
|
|
Engine 1 pumps off water (far left) back to the primary dump tank while leaving room for Tanker 8 to dump its water.
|
|
Loading Tanker 4 using dual fill lines equipped with 3-inch cam lock fittings.
|
|
|