Got Big Water

YouTube
YouTube Channel

Facebook
Facebook Page

Twitter
Twitter Page

Rural Water Supply Operations Seminar
Rural Water Supply Operations Seminar

Water Supply Officer Seminar
Water Supply Officer Seminar

Relay Pumping With Large Diameter Hose
Relay Pumping With Large Diameter Hose

Dry Fire Hydrants Seminar
Dry Fire Hydrants Seminar

Dry Fire Hydrant Designs and Installations
Dry Fire Hydrant Designs and Installations

Suction Strainer Flow Test Project:Test Results

Web Counters
Website Visitors
Since
June 22, 2009
2,861,618
Visitors Today
Apr 25, 2024
320



Official PayPal Seal
Dry Fire Hydrant Repair & Maintenance #04 - The Importance of Flow Testing
Email Print RSS Facebook Twitter RSS

By President Mark Davis
March 8, 2018

Our website followers know we continually stress the importance of water supply source inspection and testing. Without flow testing, there is no definitive way to ensure the operational readiness of dry fire hydrant systems. The dry fire hydrant head shown in this news story clearly leaks. Local FD crews reported an inability to establish a prime. We connected a pumper and behold, no prime could be established. The pumper driver then back-flushed (allowed tank water to run into the DFH) and the problem was quickly found. The suction head needs to be replaced - there is no other type of repair that will remedy this problem.

Once again, the inspection and flow testing of dry fire hydrant systems in compliance with the recognized standards is very important to the success of a water supply delivery program.

Website Designed and Hosted By: Content Proudly Maintained By: Contact Info:
Firehouse Solutions
www.FirehouseSolutions.com
GBW Associates, LLC
3178 Cardinal Drive
Westminster, MD 21157

Emergency Dial 911
Phone: 443-398-6619
E-mail: thebigcamel@gotbigwater.com
Copyright © 2024 Firehouse Solutions (A Service of Technology Reflections, Inc.)